Mould Manufacturing

China plastic injection moulding manufacturer for earring m15101901

We have complete cost control system and carry out strict "supply chain management systems”, manufacture management systems, quality management systems, logistics management systems and design management systems. We strive to reduce the cost for our clients. Call us today what you needs, and we’ll give you a better than expected results.

We promise: All customer-centric, never for short-term profit, and sell long-term benefits

We produce: Mold, prototype, injection molding, product assembly, surface printing, spraying the surface integration

Please provide: 2D, 3D, samples, or the size of the multi-angle pictures

Mould Time: 20-35 Days

Plastic product time: 7-15 Days

Moud precision: +/-0.01mm

Mould life: 300,000-1,000,000 shots

Producing Process:

Audit drawings - mold flow analysis - design validation - Custom Materials - mold processing - core processing - electrode machining - Runner system processing - parts processing and procurement - machining acceptance - cavity surface treatment process - complex mode Die - The entire mold surface coating - Mounting plate - mold sample - sample test - sending samples

Mould cavity:  One cavity, multi-cavity or different products be made together

Mould material: P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 etc.

Runner system: Hot runner and cold runner

Base material: P20,2738,2344,718,S136,8407,NAK80,SKD61,H13

Finish: Pitting the word, mirror finish, matte surface, striae

Standard:  HASCO, DME or dependent upon

Main thechnology: Milling, grinding, CNC, EDM, wire cutting, carving, EDM, lathes, surface Finish, etc.

Software: CAD,PRO-E,UG  Design Time: 1-3 days (normal circumstances)

Plastic product material: 

ABS,PP,PC,PA6,PA66,TPU,POM,PBT,PVC,HIPS,PMMA,TPE,PC/ABS,   TPV,  TPO,TPR,EVA,HDPE,LDPE,CPVC,PVDF,PPSU.PPS. etc

Quality system:  ISO9001:2008

Equipment:  CNC,EDM,Cutting off Machine,plastic machinery,etc plastic part